In the fall of 2018, the current pool began experiencing many problems which rendered it unusable. Delta 3 Engineering and Badger Swim Pools were commissioned to conduct a pool audit in October of 2018. The study noted: 

  • The main drain valve is inoperable

  • The pool is leaking approximately 8,000 gallons per day

  • The pool surface tile is failing

  • The mud slab below the tile is eroding and soft

  • The pool floor slope does not meet current standards

  • The main drain piping is in poor condition and needs to be replaced